Abstract
The technical, logistical, and ecological challenges associated with offshore wind development necessitate an extensive site selection analysis. Technical parameters such as wind resource, logistical concerns such as distance to shore, and ecological considerations such as fisheries all must be evaluated and weighted, in many cases with incomplete or uncertain data. Making such a critical decision with severe potential economic and ecologic consequences requires a strong decision-making approach to ultimately guide the site selection process. This paper proposes a type-2 neutrosophic number (T2NN) fuzzy based multi-criteria decision-making (MCDM) model for offshore wind farm (OWF) site selection. This approach combines the advantages of neutrosophic numbers sets, which can utilize uncertain and incomplete information, with a multi-attributive border approximation area comparison that provides formulation flexibility and easy calculation. Further, this study develops and integrates a techno-economic model for OWFs in the decision-making. A case study is performed to evaluate and rank five proposed OWF sites off the coast of New Jersey. To validate the proposed model, a comparison against three alternative T2NN fuzzy based models is performed. It is demonstrated that the implemented model yields the same ranking order as the alternative approaches. Sensitivity analysis reveals that changing criteria weightings does not affect the ranking order.
Original language | English |
---|---|
Article number | 104311 |
Journal | Engineering Applications of Artificial Intelligence |
Volume | 103 |
Early online date | 3 Jun 2021 |
DOIs | |
Publication status | Published - Aug 2021 |
Keywords
- Decision-making
- Fuzzy sets
- Offshore wind
- Site selection
- Type-2 neutrosophic number
ASJC Scopus subject areas
- Control and Systems Engineering
- Artificial Intelligence
- Electrical and Electronic Engineering