The zero-emissions resource pool: construction materials compatible with a realistic view of delivering zero-emissions in the UK by 2050

  • University of Cambridge
  • Materials Cycles Division

Research output: Contribution to journalReview articlepeer-review

Abstract

The construction sector faces the daunting task of meeting growing construction demand with a 'zero-emission resource pool'—materials that are compatible with a near-future zero-emissions economy. Most decarbonisation roadmaps and scenario analyses for the sector depend heavily on high-risk technologies such as carbon storage that have not yet been deployed at significant scale, or favour recycling whilst overlooking likely constraints from limited supplies of zero-emissions electricity. This paper therefore provides a first critical review of options to supply construction materials in the UK with realistic expectations about the availability of carbon storage, zero-emissions electricity and zero-emissions transport. The paper focuses on nine key construction materials—concrete, steel, aluminium, structural glass, timber, earth, stone, lime and straw. We conclude that the zero-emissions resource pool includes virgin bio-based materials, limited by the availability of productive land, virgin earth and stone, limited by local geology and transportation, recycled materials, limited by the availability of scrap and emission-free electricity, and reused components, limited by availability and refurbishment potential. This points to the need for a revision to the national construction strategy and a range of entrepreneurial opportunities in delivering the services of construction within a reduced material budget.
Original languageEnglish
Article number55
JournalArchitecture, Structures and Construction
Volume5
Issue number2
Early online date4 Sept 2025
DOIs
Publication statusPublished - 31 Dec 2025

Data Availability Statement

No datasets were generated or analysed during the current study.

Funding

This research was supported in part by Whitby Wood, the Engineering and Physical Sciences Research Council (EPSRC) in the United Kingdom through UK FIRES (grant reference EP/S019111/1) and the JSPS KAKENHI (grant reference 22K18433).

FundersFunder number
Engineering and Physical Sciences Research CouncilEP/S019111/1
Japan Society for the Promotion of Science22K18433

Keywords

  • Construction materials
  • Decarbonisation
  • Embodied carbon
  • Zero-emissions infrastructure

ASJC Scopus subject areas

  • Building and Construction
  • Civil and Structural Engineering
  • Architecture
  • Materials Science (miscellaneous)

Fingerprint

Dive into the research topics of 'The zero-emissions resource pool: construction materials compatible with a realistic view of delivering zero-emissions in the UK by 2050'. Together they form a unique fingerprint.

Cite this