Abstract
Port logistics plays a crucial role in the efficiency of global trade, encompassing key operations such as berth allocation, quay crane assignment, and pilotage scheduling. Traditional approaches often treat these processes independently, leading to inefficiencies in resource utilization, increased operational costs, and prolonged vessel turnaround times. This paper addresses these challenges by proposing an integrated planning framework that simultaneously optimizes berth allocation, quay crane assignment, and pilotage scheduling. A novel integer programming model is proposed to jointly consider decisions related to pilotage, berthing, and handling operations, with the objective of minimizing vessel delays and pilot-related costs. To address the computational challenges encountered in practical applications, an adaptive large neighborhood search (ALNS) metaheuristic, enhanced with tailored berth allocation heuristics and problem-specific operators, is designed. Extensive numerical experiments are conducted to evaluate the performance of the integrated framework under diverse operational scenarios. The results demonstrate that the integrated approach is effective in reducing vessel turnaround times, improving resource utilization, and lowering total costs. Furthermore, a detailed sensitivity analysis is performed to assess the impact of variations in pilot availability, time-window constraints, and channel capacity on scheduling outcomes. These findings provide actionable insights for port operators aiming to enhance operational efficiency and cost-effectiveness, and highlight the advantages of a holistic view of berth allocation, quay crane assignment, and pilotage scheduling.
| Original language | English |
|---|---|
| Article number | 107201 |
| Journal | Computers and Operations Research |
| Volume | 184 |
| Early online date | 24 Jul 2025 |
| DOIs | |
| Publication status | Published - 31 Dec 2025 |
Funding
This research is supported by the National Natural Science Foundation of China (Grant Nos. 72201164 , 72101178 ) and the “Chen Guang” project funded by the Shanghai Municipal Education Commission and Shanghai Education Development Foundation (Grant No. 21CGA49 ).
| Funders | Funder number |
|---|---|
| Shanghai Municipal Education Commission | |
| National Natural Science Foundation of China | 72201164, 72101178 |
| Shanghai Education Development Foundation | 21CGA49 |
Keywords
- Berth allocation
- Integrated planning
- Metaheuristic approach
- Pilotage scheduling
- Quay crane assignment
ASJC Scopus subject areas
- General Computer Science
- Modelling and Simulation
- Management Science and Operations Research
Fingerprint
Dive into the research topics of 'The integrated planning of berth allocation, quay crane assignment, and pilotage scheduling'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS