Scheduling twin robots on a line

Gunes Erdogan, Maria Battarra, Gilbert Laporte

Research output: Contribution to journalArticle

12 Citations (Scopus)
85 Downloads (Pure)
Original languageEnglish
Pages (from-to)119-130
JournalNaval Research Logistics
Volume61
Issue number2
DOIs
Publication statusPublished - 1 Mar 2014

Cite this

Scheduling twin robots on a line. / Erdogan, Gunes; Battarra, Maria; Laporte, Gilbert.

In: Naval Research Logistics, Vol. 61, No. 2, 01.03.2014, p. 119-130.

Research output: Contribution to journalArticle

Erdogan, Gunes ; Battarra, Maria ; Laporte, Gilbert. / Scheduling twin robots on a line. In: Naval Research Logistics. 2014 ; Vol. 61, No. 2. pp. 119-130.
@article{badde3ff65644e488fa9791807045c2f,
title = "Scheduling twin robots on a line",
author = "Gunes Erdogan and Maria Battarra and Gilbert Laporte",
year = "2014",
month = "3",
day = "1",
doi = "10.1002/nav.21570",
language = "English",
volume = "61",
pages = "119--130",
journal = "Naval Research Logistics",
issn = "0894-069X",
publisher = "John Wiley and Sons Inc.",
number = "2",

}

TY - JOUR

T1 - Scheduling twin robots on a line

AU - Erdogan, Gunes

AU - Battarra, Maria

AU - Laporte, Gilbert

PY - 2014/3/1

Y1 - 2014/3/1

UR - http://dx.doi.org/10.1002/nav.21570

U2 - 10.1002/nav.21570

DO - 10.1002/nav.21570

M3 - Article

VL - 61

SP - 119

EP - 130

JO - Naval Research Logistics

JF - Naval Research Logistics

SN - 0894-069X

IS - 2

ER -