Projects per year
Abstract
Long-term investment for large-scale low voltage (LV) (0.4 kV in the U.K.) networks is one of the key issues concerned by distribution network operators (DNOs). The major difficulties in carrying out long-term LV distribution network investment at the system level are the extensiveness of these networks and the very limited network information, such as utilizations of transformers and circuits.
Original language | English |
---|---|
Article number | 6299007 |
Pages (from-to) | 810-818 |
Number of pages | 9 |
Journal | IEEE Transactions on Power Systems |
Volume | 28 |
Issue number | 2 |
DOIs | |
Publication status | Published - May 2013 |
Fingerprint
Dive into the research topics of 'Quantification of low voltage network reinforcement costs: A statistical approach'. Together they form a unique fingerprint.Projects
- 2 Finished
-
Integrated operation and Planning for Smart Electric Distribution Networks (OPEN)
Li, F. (PI)
Engineering and Physical Sciences Research Council
21/04/13 → 20/04/16
Project: Research council
-
ECONOMICALLY EFFICIENT NETWORK CHARGING METHODOLOGY FOR A SY STEM WITH SIGNIFICANT INTERMITTENT GENERATION - ARF
Li, F. (PI)
Engineering and Physical Sciences Research Council
1/10/06 → 30/09/11
Project: Research council