Perceptions of lean design management

M. H. El. Reifi, S. Emmitt

Research output: Contribution to journalArticle

19 Citations (Scopus)

Abstract

The importance of managing the early design phases effectively and efficiently is relatively well appreciated, although how best to do this is not so clear. The successful use of lean management in the construction phase, using the principles largely developed by Toyota, has opened up the possibility of using lean design management, thus helping to establish a systematic approach to the creative design phase. This study explores the interpretation and application of lean design management in architecture, engineering and construction (AEC). A survey questionnaire was used to obtain an understanding of current design management processes and practices in the UK. Findings from 125 responses indicate that inefficiencies are related to ineffective design management processes (e.g. management of briefing, design, etc.) as well as problems with procurement. The main conclusion drawn is that lean design management appears valid for implementation in the AEC sector, but needs to be customised according to the project context in order to achieve the desired value for all stakeholders.
Original languageEnglish
Pages (from-to)195-208
JournalArchitectural Engineering and Design Management
Volume9
Issue number3
DOIs
Publication statusPublished - 1 Aug 2013

Fingerprint

Design management
Management process
Procurement
Lean management
Toyota
Construction sector
Stakeholders
Management practices
Inefficiency
Process management
Questionnaire survey

Cite this

Perceptions of lean design management. / El. Reifi, M. H.; Emmitt, S.

In: Architectural Engineering and Design Management, Vol. 9, No. 3, 01.08.2013, p. 195-208.

Research output: Contribution to journalArticle

@article{0cd652ca70694f19a414253b524de747,
title = "Perceptions of lean design management",
abstract = "The importance of managing the early design phases effectively and efficiently is relatively well appreciated, although how best to do this is not so clear. The successful use of lean management in the construction phase, using the principles largely developed by Toyota, has opened up the possibility of using lean design management, thus helping to establish a systematic approach to the creative design phase. This study explores the interpretation and application of lean design management in architecture, engineering and construction (AEC). A survey questionnaire was used to obtain an understanding of current design management processes and practices in the UK. Findings from 125 responses indicate that inefficiencies are related to ineffective design management processes (e.g. management of briefing, design, etc.) as well as problems with procurement. The main conclusion drawn is that lean design management appears valid for implementation in the AEC sector, but needs to be customised according to the project context in order to achieve the desired value for all stakeholders.",
author = "{El. Reifi}, {M. H.} and S. Emmitt",
year = "2013",
month = "8",
day = "1",
doi = "10.1080/17452007.2013.802979",
language = "English",
volume = "9",
pages = "195--208",
journal = "Architectural Engineering and Design Management",
issn = "1745-2007",
publisher = "Earthscan",
number = "3",

}

TY - JOUR

T1 - Perceptions of lean design management

AU - El. Reifi, M. H.

AU - Emmitt, S.

PY - 2013/8/1

Y1 - 2013/8/1

N2 - The importance of managing the early design phases effectively and efficiently is relatively well appreciated, although how best to do this is not so clear. The successful use of lean management in the construction phase, using the principles largely developed by Toyota, has opened up the possibility of using lean design management, thus helping to establish a systematic approach to the creative design phase. This study explores the interpretation and application of lean design management in architecture, engineering and construction (AEC). A survey questionnaire was used to obtain an understanding of current design management processes and practices in the UK. Findings from 125 responses indicate that inefficiencies are related to ineffective design management processes (e.g. management of briefing, design, etc.) as well as problems with procurement. The main conclusion drawn is that lean design management appears valid for implementation in the AEC sector, but needs to be customised according to the project context in order to achieve the desired value for all stakeholders.

AB - The importance of managing the early design phases effectively and efficiently is relatively well appreciated, although how best to do this is not so clear. The successful use of lean management in the construction phase, using the principles largely developed by Toyota, has opened up the possibility of using lean design management, thus helping to establish a systematic approach to the creative design phase. This study explores the interpretation and application of lean design management in architecture, engineering and construction (AEC). A survey questionnaire was used to obtain an understanding of current design management processes and practices in the UK. Findings from 125 responses indicate that inefficiencies are related to ineffective design management processes (e.g. management of briefing, design, etc.) as well as problems with procurement. The main conclusion drawn is that lean design management appears valid for implementation in the AEC sector, but needs to be customised according to the project context in order to achieve the desired value for all stakeholders.

UR - http://dx.doi.org/10.1080/17452007.2013.802979

U2 - 10.1080/17452007.2013.802979

DO - 10.1080/17452007.2013.802979

M3 - Article

VL - 9

SP - 195

EP - 208

JO - Architectural Engineering and Design Management

JF - Architectural Engineering and Design Management

SN - 1745-2007

IS - 3

ER -