Optimization of power system scheduling based on SCEM-UA algorithm

Zi Yang Qiang, Feng Ping Wu, Jia Rui Dong, Rui Dong Heng

Research output: Contribution to journalArticle

3 Citations (Scopus)

Abstract

Due to the world's increasingly serious energy crisis, shortage of resources, and environmental degradation, traditional power system analysis and scheduling optimization methods have faced new challenges. This article examines the features of optimal scheduling of power system containing cascade hydropower, and establishes a scheduling model based on the Shuffled Complex Evolution Metropolis (SCEM-UA) algorithm. This model takes the cost of power generation, emission of gaseous pollutants, and the characteristics of the generators fully into account. Constraints on the changes in thermoelectric generator power output were added to the set of constraint conditions, reducing the impact of thermal power fluctuations on the power system. Here, the SCEM-UA algorithm was used to solve the problem of optimal power system scheduling and render the model capable of global optimization searches. Analyses of simulated cases have demonstrated that the SCEM-UA algorithm can resolve the conflict between convergence speed and global search capability, increasing the global search capability of the model.

Original languageEnglish
Pages (from-to)413-420
Number of pages8
JournalTelkomnika (Telecommunication Computing Electronics and Control)
Volume13
Issue number2
DOIs
Publication statusPublished - Jun 2015

Fingerprint

Scheduling
Global optimization
Weathering
Power generation
Systems analysis
Costs

Keywords

  • Multi chain reservoirs
  • Power system scheduling
  • SCEM-UA algorithm

Cite this

Optimization of power system scheduling based on SCEM-UA algorithm. / Qiang, Zi Yang; Wu, Feng Ping; Dong, Jia Rui; Heng, Rui Dong.

In: Telkomnika (Telecommunication Computing Electronics and Control), Vol. 13, No. 2, 06.2015, p. 413-420.

Research output: Contribution to journalArticle

Qiang, Zi Yang ; Wu, Feng Ping ; Dong, Jia Rui ; Heng, Rui Dong. / Optimization of power system scheduling based on SCEM-UA algorithm. In: Telkomnika (Telecommunication Computing Electronics and Control). 2015 ; Vol. 13, No. 2. pp. 413-420.
@article{91e73a3428ff48eebcc6e1d9e7060760,
title = "Optimization of power system scheduling based on SCEM-UA algorithm",
abstract = "Due to the world's increasingly serious energy crisis, shortage of resources, and environmental degradation, traditional power system analysis and scheduling optimization methods have faced new challenges. This article examines the features of optimal scheduling of power system containing cascade hydropower, and establishes a scheduling model based on the Shuffled Complex Evolution Metropolis (SCEM-UA) algorithm. This model takes the cost of power generation, emission of gaseous pollutants, and the characteristics of the generators fully into account. Constraints on the changes in thermoelectric generator power output were added to the set of constraint conditions, reducing the impact of thermal power fluctuations on the power system. Here, the SCEM-UA algorithm was used to solve the problem of optimal power system scheduling and render the model capable of global optimization searches. Analyses of simulated cases have demonstrated that the SCEM-UA algorithm can resolve the conflict between convergence speed and global search capability, increasing the global search capability of the model.",
keywords = "Multi chain reservoirs, Power system scheduling, SCEM-UA algorithm",
author = "Qiang, {Zi Yang} and Wu, {Feng Ping} and Dong, {Jia Rui} and Heng, {Rui Dong}",
year = "2015",
month = "6",
doi = "10.12928/TELKOMNIKA.v13i2.1472",
language = "English",
volume = "13",
pages = "413--420",
journal = "Telkomnika (Telecommunication Computing Electronics and Control)",
issn = "1693-6930",
publisher = "Institute of Advanced Engineering and Science (IAES)",
number = "2",

}

TY - JOUR

T1 - Optimization of power system scheduling based on SCEM-UA algorithm

AU - Qiang, Zi Yang

AU - Wu, Feng Ping

AU - Dong, Jia Rui

AU - Heng, Rui Dong

PY - 2015/6

Y1 - 2015/6

N2 - Due to the world's increasingly serious energy crisis, shortage of resources, and environmental degradation, traditional power system analysis and scheduling optimization methods have faced new challenges. This article examines the features of optimal scheduling of power system containing cascade hydropower, and establishes a scheduling model based on the Shuffled Complex Evolution Metropolis (SCEM-UA) algorithm. This model takes the cost of power generation, emission of gaseous pollutants, and the characteristics of the generators fully into account. Constraints on the changes in thermoelectric generator power output were added to the set of constraint conditions, reducing the impact of thermal power fluctuations on the power system. Here, the SCEM-UA algorithm was used to solve the problem of optimal power system scheduling and render the model capable of global optimization searches. Analyses of simulated cases have demonstrated that the SCEM-UA algorithm can resolve the conflict between convergence speed and global search capability, increasing the global search capability of the model.

AB - Due to the world's increasingly serious energy crisis, shortage of resources, and environmental degradation, traditional power system analysis and scheduling optimization methods have faced new challenges. This article examines the features of optimal scheduling of power system containing cascade hydropower, and establishes a scheduling model based on the Shuffled Complex Evolution Metropolis (SCEM-UA) algorithm. This model takes the cost of power generation, emission of gaseous pollutants, and the characteristics of the generators fully into account. Constraints on the changes in thermoelectric generator power output were added to the set of constraint conditions, reducing the impact of thermal power fluctuations on the power system. Here, the SCEM-UA algorithm was used to solve the problem of optimal power system scheduling and render the model capable of global optimization searches. Analyses of simulated cases have demonstrated that the SCEM-UA algorithm can resolve the conflict between convergence speed and global search capability, increasing the global search capability of the model.

KW - Multi chain reservoirs

KW - Power system scheduling

KW - SCEM-UA algorithm

UR - http://www.scopus.com/inward/record.url?scp=84932081246&partnerID=8YFLogxK

UR - http://dx.doi.org/0.12928/TELKOMNIKA.v13i2.1472

U2 - 10.12928/TELKOMNIKA.v13i2.1472

DO - 10.12928/TELKOMNIKA.v13i2.1472

M3 - Article

VL - 13

SP - 413

EP - 420

JO - Telkomnika (Telecommunication Computing Electronics and Control)

JF - Telkomnika (Telecommunication Computing Electronics and Control)

SN - 1693-6930

IS - 2

ER -