The integration of renewable generation requires updates in transmission planning criterion and transmission pricing method. To reflect the recent updates in GB NETS SQSS, an improved ICRP method was developed. The main modification is the development of dual backgrounds - Peak Security (PS) background and Year Round (YR) background. The capacity sharing concept is introduced into YR background and the tariff for different generation technologies is scaled by its load factor. This paper mainly evaluates the consistence between NETS SQSS and the improved ICRP method. A reduced GB power system is employed as case study. The location, time and attitude of congestion costs over one year are shown to prove congestion is not uniform through the system. Afterwards, a congestion cost duration curve is first introduced, which is one of the main contributions of this paper. This curve is divided into five parts that reflecting different congestion condition. The generator load factors under different parts are explored. The analysis in this paper indicates that the improved ICRP method subjectively keeps the consistence but betrays the faire principle in transmission pricing. More than one YR backgrounds and a variant form of load factor are required by the conclusion of this paper.
LanguageEnglish
Title of host publicationPower Engineering Conference (UPEC), 2013 48th International Universities'
Place of PublicationDublin
PublisherIEEE
Pages1-6
Number of pages6
ISBN (Print)9781479932542
DOIs
StatusPublished - 2013
Event2013 48th Universities' Power Engineering Conference (UPEC) - Dublin, Ireland, UK United Kingdom
Duration: 2 Sep 20135 Sep 2013

Conference

Conference2013 48th Universities' Power Engineering Conference (UPEC)
CountryUK United Kingdom
CityDublin, Ireland
Period2/09/135/09/13

Fingerprint

Electric power transmission networks
Costs
Planning

Cite this

Li, J., Yuan, C., Zheng, Z., & Li, F. (2013). Load factor based transmission network pricing: An evaluation for the improved ICRP method. In Power Engineering Conference (UPEC), 2013 48th International Universities' (pp. 1-6). [6714918] Dublin : IEEE. DOI: 10.1109/UPEC.2013.6714918

Load factor based transmission network pricing : An evaluation for the improved ICRP method. / Li, Jiangtao; Yuan, Chenchen; Zheng, Zhanghua; Li, Furong.

Power Engineering Conference (UPEC), 2013 48th International Universities'. Dublin : IEEE, 2013. p. 1-6 6714918.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Li, J, Yuan, C, Zheng, Z & Li, F 2013, Load factor based transmission network pricing: An evaluation for the improved ICRP method. in Power Engineering Conference (UPEC), 2013 48th International Universities'., 6714918, IEEE, Dublin , pp. 1-6, 2013 48th Universities' Power Engineering Conference (UPEC), Dublin, Ireland, UK United Kingdom, 2/09/13. DOI: 10.1109/UPEC.2013.6714918
Li J, Yuan C, Zheng Z, Li F. Load factor based transmission network pricing: An evaluation for the improved ICRP method. In Power Engineering Conference (UPEC), 2013 48th International Universities'. Dublin : IEEE. 2013. p. 1-6. 6714918. Available from, DOI: 10.1109/UPEC.2013.6714918
Li, Jiangtao ; Yuan, Chenchen ; Zheng, Zhanghua ; Li, Furong. / Load factor based transmission network pricing : An evaluation for the improved ICRP method. Power Engineering Conference (UPEC), 2013 48th International Universities'. Dublin : IEEE, 2013. pp. 1-6
@inproceedings{d38748819edd4d47baf333961728f5c2,
title = "Load factor based transmission network pricing: An evaluation for the improved ICRP method",
abstract = "The integration of renewable generation requires updates in transmission planning criterion and transmission pricing method. To reflect the recent updates in GB NETS SQSS, an improved ICRP method was developed. The main modification is the development of dual backgrounds - Peak Security (PS) background and Year Round (YR) background. The capacity sharing concept is introduced into YR background and the tariff for different generation technologies is scaled by its load factor. This paper mainly evaluates the consistence between NETS SQSS and the improved ICRP method. A reduced GB power system is employed as case study. The location, time and attitude of congestion costs over one year are shown to prove congestion is not uniform through the system. Afterwards, a congestion cost duration curve is first introduced, which is one of the main contributions of this paper. This curve is divided into five parts that reflecting different congestion condition. The generator load factors under different parts are explored. The analysis in this paper indicates that the improved ICRP method subjectively keeps the consistence but betrays the faire principle in transmission pricing. More than one YR backgrounds and a variant form of load factor are required by the conclusion of this paper.",
author = "Jiangtao Li and Chenchen Yuan and Zhanghua Zheng and Furong Li",
year = "2013",
doi = "10.1109/UPEC.2013.6714918",
language = "English",
isbn = "9781479932542",
pages = "1--6",
booktitle = "Power Engineering Conference (UPEC), 2013 48th International Universities'",
publisher = "IEEE",
address = "USA United States",

}

TY - GEN

T1 - Load factor based transmission network pricing

T2 - An evaluation for the improved ICRP method

AU - Li,Jiangtao

AU - Yuan,Chenchen

AU - Zheng,Zhanghua

AU - Li,Furong

PY - 2013

Y1 - 2013

N2 - The integration of renewable generation requires updates in transmission planning criterion and transmission pricing method. To reflect the recent updates in GB NETS SQSS, an improved ICRP method was developed. The main modification is the development of dual backgrounds - Peak Security (PS) background and Year Round (YR) background. The capacity sharing concept is introduced into YR background and the tariff for different generation technologies is scaled by its load factor. This paper mainly evaluates the consistence between NETS SQSS and the improved ICRP method. A reduced GB power system is employed as case study. The location, time and attitude of congestion costs over one year are shown to prove congestion is not uniform through the system. Afterwards, a congestion cost duration curve is first introduced, which is one of the main contributions of this paper. This curve is divided into five parts that reflecting different congestion condition. The generator load factors under different parts are explored. The analysis in this paper indicates that the improved ICRP method subjectively keeps the consistence but betrays the faire principle in transmission pricing. More than one YR backgrounds and a variant form of load factor are required by the conclusion of this paper.

AB - The integration of renewable generation requires updates in transmission planning criterion and transmission pricing method. To reflect the recent updates in GB NETS SQSS, an improved ICRP method was developed. The main modification is the development of dual backgrounds - Peak Security (PS) background and Year Round (YR) background. The capacity sharing concept is introduced into YR background and the tariff for different generation technologies is scaled by its load factor. This paper mainly evaluates the consistence between NETS SQSS and the improved ICRP method. A reduced GB power system is employed as case study. The location, time and attitude of congestion costs over one year are shown to prove congestion is not uniform through the system. Afterwards, a congestion cost duration curve is first introduced, which is one of the main contributions of this paper. This curve is divided into five parts that reflecting different congestion condition. The generator load factors under different parts are explored. The analysis in this paper indicates that the improved ICRP method subjectively keeps the consistence but betrays the faire principle in transmission pricing. More than one YR backgrounds and a variant form of load factor are required by the conclusion of this paper.

UR - http://dit.ie/upec2013/

UR - http://ieeexplore.ieee.org/lpdocs/epic03/wrapper.htm?arnumber=6714918

UR - http://dx.doi.org/10.1109/UPEC.2013.6714918

U2 - 10.1109/UPEC.2013.6714918

DO - 10.1109/UPEC.2013.6714918

M3 - Conference contribution

SN - 9781479932542

SP - 1

EP - 6

BT - Power Engineering Conference (UPEC), 2013 48th International Universities'

PB - IEEE

CY - Dublin

ER -