基于模糊理论的城市电网风险识别与评价

Translated title of the contribution: Identification and evaluation of risk in urban network planning based on fuzzy theory

Yongxiu He, Aiying Dai, Weihong Yang, Rui Fang, Furong Li

Research output: Contribution to journalArticle

11 Citations (Scopus)

Abstract

To enhance the scientificity of urban power network planning, it is necessary to identify and evaluate the risks in urban power network. In this paper, a questionnaire of urban power network concerning the risks in domestic urban power network is designed; then based on fuzzy membership theory the possibility of occurring risk in different stages, i.e., planning stage, feasibility study stage, construction stage and operation stage, etc., and the extent of damage are quantized; and then the comprehensive quantization score of each risk are given; finally, the key risks, which special attention should paid to in planning, construction and operation stages of urban power network, are summarized. The proposed method could offer decision base to evade risks in different stages of urban power network.
Original languageChinese
Pages (from-to)127-132
Number of pages6
JournalDianwang Jishu/Power System Technology
Volume34
Issue number9
Publication statusPublished - Sep 2010

Fingerprint

Planning

Cite this

基于模糊理论的城市电网风险识别与评价. / He, Yongxiu; Dai, Aiying; Yang, Weihong; Fang, Rui; Li, Furong.

In: Dianwang Jishu/Power System Technology, Vol. 34, No. 9, 09.2010, p. 127-132.

Research output: Contribution to journalArticle

He, Y, Dai, A, Yang, W, Fang, R & Li, F 2010, '基于模糊理论的城市电网风险识别与评价', Dianwang Jishu/Power System Technology, vol. 34, no. 9, pp. 127-132.
He, Yongxiu ; Dai, Aiying ; Yang, Weihong ; Fang, Rui ; Li, Furong. / 基于模糊理论的城市电网风险识别与评价. In: Dianwang Jishu/Power System Technology. 2010 ; Vol. 34, No. 9. pp. 127-132.
@article{70d7cc9515b545af82617e14713d2cdb,
title = "基于模糊理论的城市电网风险识别与评价",
abstract = "To enhance the scientificity of urban power network planning, it is necessary to identify and evaluate the risks in urban power network. In this paper, a questionnaire of urban power network concerning the risks in domestic urban power network is designed; then based on fuzzy membership theory the possibility of occurring risk in different stages, i.e., planning stage, feasibility study stage, construction stage and operation stage, etc., and the extent of damage are quantized; and then the comprehensive quantization score of each risk are given; finally, the key risks, which special attention should paid to in planning, construction and operation stages of urban power network, are summarized. The proposed method could offer decision base to evade risks in different stages of urban power network.",
author = "Yongxiu He and Aiying Dai and Weihong Yang and Rui Fang and Furong Li",
year = "2010",
month = "9",
language = "Chinese",
volume = "34",
pages = "127--132",
journal = "Dianwang Jishu/Power System Technology",
issn = "1000-3673",
publisher = "Power System Technology Press",
number = "9",

}

TY - JOUR

T1 - 基于模糊理论的城市电网风险识别与评价

AU - He, Yongxiu

AU - Dai, Aiying

AU - Yang, Weihong

AU - Fang, Rui

AU - Li, Furong

PY - 2010/9

Y1 - 2010/9

N2 - To enhance the scientificity of urban power network planning, it is necessary to identify and evaluate the risks in urban power network. In this paper, a questionnaire of urban power network concerning the risks in domestic urban power network is designed; then based on fuzzy membership theory the possibility of occurring risk in different stages, i.e., planning stage, feasibility study stage, construction stage and operation stage, etc., and the extent of damage are quantized; and then the comprehensive quantization score of each risk are given; finally, the key risks, which special attention should paid to in planning, construction and operation stages of urban power network, are summarized. The proposed method could offer decision base to evade risks in different stages of urban power network.

AB - To enhance the scientificity of urban power network planning, it is necessary to identify and evaluate the risks in urban power network. In this paper, a questionnaire of urban power network concerning the risks in domestic urban power network is designed; then based on fuzzy membership theory the possibility of occurring risk in different stages, i.e., planning stage, feasibility study stage, construction stage and operation stage, etc., and the extent of damage are quantized; and then the comprehensive quantization score of each risk are given; finally, the key risks, which special attention should paid to in planning, construction and operation stages of urban power network, are summarized. The proposed method could offer decision base to evade risks in different stages of urban power network.

UR - http://www.scopus.com/inward/record.url?scp=78651594561&partnerID=8YFLogxK

UR - http://www.dwjs.com.cn/EN/abstract/abstract23474.shtml

M3 - Article

VL - 34

SP - 127

EP - 132

JO - Dianwang Jishu/Power System Technology

JF - Dianwang Jishu/Power System Technology

SN - 1000-3673

IS - 9

ER -