Formulation and solution method on flexible transmission expansion planning

Z Hu, Furong Li

Research output: Chapter in Book/Report/Conference proceedingOther chapter contribution

Abstract

In this paper, a transmission expansion planning formulation is proposed that simultaneously considers investment in phase shifters and in primary network assets, such as lines and transformers. Based on the classical network expansion planning formulation, a new mixed-integer linear programming (MILP) formulation is built to deal with the placement of phase shifter along with adding new branches, while the N-1 security criterion is considered. The curtailment of wind farm output is also discussed. The whole problem is solved by Benders' decomposition method. Simulations have been done on the Garver 6-bus system. The planning schemes obtained from the proposed method showing cost reduction offered by phase shifters over the traditional circuit expansion.
LanguageEnglish
Title of host publication18th IFAC World Congress
Pages11685-11689
DOIs
StatusPublished - 28 Aug 2011
Event18th IFAC World Congress - Milano, Italy
Duration: 27 Aug 20111 Sep 2011

Conference

Conference18th IFAC World Congress
CountryItaly
CityMilano
Period27/08/111/09/11

Fingerprint

Phase shifters
Planning
Cost reduction
Linear programming
Farms
Decomposition
Networks (circuits)

Cite this

Formulation and solution method on flexible transmission expansion planning. / Hu, Z; Li, Furong.

18th IFAC World Congress. 2011. p. 11685-11689.

Research output: Chapter in Book/Report/Conference proceedingOther chapter contribution

Hu, Z & Li, F 2011, Formulation and solution method on flexible transmission expansion planning. in 18th IFAC World Congress. pp. 11685-11689, 18th IFAC World Congress, Milano, Italy, 27/08/11. https://doi.org/10.3182/20110828-6-IT-1002.01845
@inbook{2326a3a2c5ce4346a0fc49081ee1ebe4,
title = "Formulation and solution method on flexible transmission expansion planning",
abstract = "In this paper, a transmission expansion planning formulation is proposed that simultaneously considers investment in phase shifters and in primary network assets, such as lines and transformers. Based on the classical network expansion planning formulation, a new mixed-integer linear programming (MILP) formulation is built to deal with the placement of phase shifter along with adding new branches, while the N-1 security criterion is considered. The curtailment of wind farm output is also discussed. The whole problem is solved by Benders' decomposition method. Simulations have been done on the Garver 6-bus system. The planning schemes obtained from the proposed method showing cost reduction offered by phase shifters over the traditional circuit expansion.",
author = "Z Hu and Furong Li",
year = "2011",
month = "8",
day = "28",
doi = "10.3182/20110828-6-IT-1002.01845",
language = "English",
pages = "11685--11689",
booktitle = "18th IFAC World Congress",

}

TY - CHAP

T1 - Formulation and solution method on flexible transmission expansion planning

AU - Hu, Z

AU - Li, Furong

PY - 2011/8/28

Y1 - 2011/8/28

N2 - In this paper, a transmission expansion planning formulation is proposed that simultaneously considers investment in phase shifters and in primary network assets, such as lines and transformers. Based on the classical network expansion planning formulation, a new mixed-integer linear programming (MILP) formulation is built to deal with the placement of phase shifter along with adding new branches, while the N-1 security criterion is considered. The curtailment of wind farm output is also discussed. The whole problem is solved by Benders' decomposition method. Simulations have been done on the Garver 6-bus system. The planning schemes obtained from the proposed method showing cost reduction offered by phase shifters over the traditional circuit expansion.

AB - In this paper, a transmission expansion planning formulation is proposed that simultaneously considers investment in phase shifters and in primary network assets, such as lines and transformers. Based on the classical network expansion planning formulation, a new mixed-integer linear programming (MILP) formulation is built to deal with the placement of phase shifter along with adding new branches, while the N-1 security criterion is considered. The curtailment of wind farm output is also discussed. The whole problem is solved by Benders' decomposition method. Simulations have been done on the Garver 6-bus system. The planning schemes obtained from the proposed method showing cost reduction offered by phase shifters over the traditional circuit expansion.

UR - http://dx.doi.org/10.3182/20110828-6-IT-1002.01845

U2 - 10.3182/20110828-6-IT-1002.01845

DO - 10.3182/20110828-6-IT-1002.01845

M3 - Other chapter contribution

SP - 11685

EP - 11689

BT - 18th IFAC World Congress

ER -