Expected accuracy range of cost estimates for small modular reactors at the early concept design stage

Amritpal S. Agar, Andy J. Fry, Martin J. Goodfellow, Yee M. Goh, Linda B. Newnes

Research output: Chapter or section in a book/report/conference proceedingChapter in a published conference proceeding

3 Citations (SciVal)

Abstract

Life cycle cost is an important consideration for the development and selection of new power generation technology. Large nuclear power plants (NPPs) have been subject to capital cost escalation, stemming from delays related to late design changes, procurement issues for major components, and regulatory enforced changes. These factors have contributed to the significant risk premium associated with gigawatt scale “Gen III+” designs, which have incurred significant financing costs. Large NPPs have become prohibitively expensive for many utility investors in liberalized markets and smaller economies. The challenge of reducing upfront capital costs is one of the requirements that have driven the development of innovative Small Modular Reactors (SMRs). These designs are said to offer reduced unit cost and reduced risk due to certainty of delivery, which could lead to a lower cost of capital for a utility customer. By offering a product with more cost certainty the SMR could restore investor confidence in nuclear power. The life cycle cost estimates associated with the different SMR designs are uncertain at the early stage of development. However, designers need to understand, with some confidence, the impact of technical decisions at the early development phase on the life cycle cost. This study presents an overview of cost uncertainty associated with the early design stage of the SMR. The types of cost estimating approaches available at the concept design phase are identified and categorized in terms of their expected accuracy ranges. The Overnight Cost of Construction (OCC) is an important driver of the life cycle cost of a power generation project. The expected accuracy ranges from each estimating method are used to illustrate the sensitivity of cost uncertainty to the level of design maturity. By understanding the sources and impact of cost uncertainty decision making during product development can be optimized to meet both technical and commercial requirements.

Original languageEnglish
Title of host publicationStudent Paper Competition
Subtitle of host publicationVolume 9
PublisherAmerican Society of Mechanical Engineers (ASME)
PagesV009T16A055
Number of pages8
ISBN (Print)9784888982566
DOIs
Publication statusPublished - 1 Jan 2018
Event2018 26th International Conference on Nuclear Engineering, ICONE 2018 - London, UK United Kingdom
Duration: 22 Jul 201826 Jul 2018

Conference

Conference2018 26th International Conference on Nuclear Engineering, ICONE 2018
Country/TerritoryUK United Kingdom
CityLondon
Period22/07/1826/07/18

Bibliographical note

Paper No. ICONE26-81799

ASJC Scopus subject areas

  • Nuclear Energy and Engineering

Fingerprint

Dive into the research topics of 'Expected accuracy range of cost estimates for small modular reactors at the early concept design stage'. Together they form a unique fingerprint.

Cite this