Developing a conceptual lean briefing process model for lean design management

M. H. El Reifi, S. Emmitt, K. Ruikar

Research output: Chapter in Book/Report/Conference proceedingConference contribution

2 Citations (Scopus)
LanguageEnglish
Title of host publicationProceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013
Place of PublicationBrazil
StatusPublished - 2013

Cite this

El Reifi, M. H., Emmitt, S., & Ruikar, K. (2013). Developing a conceptual lean briefing process model for lean design management. In Proceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013 Brazil.

Developing a conceptual lean briefing process model for lean design management. / El Reifi, M. H.; Emmitt, S.; Ruikar, K.

Proceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013. Brazil, 2013.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

El Reifi, MH, Emmitt, S & Ruikar, K 2013, Developing a conceptual lean briefing process model for lean design management. in Proceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013. Brazil.
El Reifi MH, Emmitt S, Ruikar K. Developing a conceptual lean briefing process model for lean design management. In Proceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013. Brazil. 2013
El Reifi, M. H. ; Emmitt, S. ; Ruikar, K. / Developing a conceptual lean briefing process model for lean design management. Proceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013. Brazil, 2013.
@inproceedings{076e9c979bf54169b6abe284521446ea,
title = "Developing a conceptual lean briefing process model for lean design management",
author = "{El Reifi}, {M. H.} and S. Emmitt and K. Ruikar",
year = "2013",
language = "English",
booktitle = "Proceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013",

}

TY - GEN

T1 - Developing a conceptual lean briefing process model for lean design management

AU - El Reifi, M. H.

AU - Emmitt, S.

AU - Ruikar, K.

PY - 2013

Y1 - 2013

UR - http://www.iglc21.ufc.br/

M3 - Conference contribution

BT - Proceedings of 21st Summit of the International Group for Lean Construction (IGLC), 2013

CY - Brazil

ER -