Assessing domestic heat storage requirements for energy flexibility over varying timescales

John Allison, Keith Bell, Joe Clarke, Andrew Cowie, Ahmed Elsayed, Graeme Flett, Gbemi Oluleye, Adam Hawkes, Graeme Hawker, Nick Kelly, Maria Manuela Marinho de Castro, Tim Sharpe, Andy Shea, Paul Strachan, Paul Tuohy

Research output: Contribution to journalArticle

7 Citations (Scopus)

Abstract

This paper explores the feasibility of storing heat in an encapsulated store to support thermal load shifting over three timescales: diurnal, weekly and seasonal. A building simulation tool was used to calculate the space heating and hot water demands for four common UK housing types and a range of operating conditions. A custom sizing methodology calculated the capacities of storage required to fully meet the heat demands over the three timescales. Corresponding storage volumes were calculated for a range of heat storage materials deemed suitable for storing heat within a dwelling, either in a tank or as an integral part of the building fabric: hot water, concrete, high-temperature magnetite blocks, and a phase change material. The results indicate that with low temperature heat storage, domestic load shifting is feasible over a few days. Beyond this timescale, the very large storage volumes required make integration in dwellings problematic. Supporting load shifting over 1–2 weeks is feasible with high temperature storage. Retention of heat over periods longer than this is challenging, even with significant levels of insulation. Seasonal storage of heat in an encapsulated store appeared impractical in all cases modelled due to the volume of material required.

Original languageEnglish
Pages (from-to)602-616
Number of pages15
JournalApplied Thermal Engineering
Volume136
DOIs
Publication statusPublished - 25 May 2018

Fingerprint

Heat storage
Space heating
Phase change materials
Magnetite
Thermal load
Temperature
Insulation
Water
Hot Temperature
Concretes

Keywords

  • Building simulation
  • Demand flexibility
  • Sizing methodology
  • Thermal demand
  • Thermal storage

ASJC Scopus subject areas

  • Energy Engineering and Power Technology
  • Industrial and Manufacturing Engineering

Cite this

Assessing domestic heat storage requirements for energy flexibility over varying timescales. / Allison, John; Bell, Keith; Clarke, Joe; Cowie, Andrew; Elsayed, Ahmed; Flett, Graeme; Oluleye, Gbemi; Hawkes, Adam; Hawker, Graeme; Kelly, Nick; de Castro, Maria Manuela Marinho; Sharpe, Tim; Shea, Andy; Strachan, Paul; Tuohy, Paul.

In: Applied Thermal Engineering, Vol. 136, 25.05.2018, p. 602-616.

Research output: Contribution to journalArticle

Allison, J, Bell, K, Clarke, J, Cowie, A, Elsayed, A, Flett, G, Oluleye, G, Hawkes, A, Hawker, G, Kelly, N, de Castro, MMM, Sharpe, T, Shea, A, Strachan, P & Tuohy, P 2018, 'Assessing domestic heat storage requirements for energy flexibility over varying timescales', Applied Thermal Engineering, vol. 136, pp. 602-616. https://doi.org/10.1016/j.applthermaleng.2018.02.104
Allison, John ; Bell, Keith ; Clarke, Joe ; Cowie, Andrew ; Elsayed, Ahmed ; Flett, Graeme ; Oluleye, Gbemi ; Hawkes, Adam ; Hawker, Graeme ; Kelly, Nick ; de Castro, Maria Manuela Marinho ; Sharpe, Tim ; Shea, Andy ; Strachan, Paul ; Tuohy, Paul. / Assessing domestic heat storage requirements for energy flexibility over varying timescales. In: Applied Thermal Engineering. 2018 ; Vol. 136. pp. 602-616.
@article{98cd2c7e23354295a06d82b71a8bb14b,
title = "Assessing domestic heat storage requirements for energy flexibility over varying timescales",
abstract = "This paper explores the feasibility of storing heat in an encapsulated store to support thermal load shifting over three timescales: diurnal, weekly and seasonal. A building simulation tool was used to calculate the space heating and hot water demands for four common UK housing types and a range of operating conditions. A custom sizing methodology calculated the capacities of storage required to fully meet the heat demands over the three timescales. Corresponding storage volumes were calculated for a range of heat storage materials deemed suitable for storing heat within a dwelling, either in a tank or as an integral part of the building fabric: hot water, concrete, high-temperature magnetite blocks, and a phase change material. The results indicate that with low temperature heat storage, domestic load shifting is feasible over a few days. Beyond this timescale, the very large storage volumes required make integration in dwellings problematic. Supporting load shifting over 1–2 weeks is feasible with high temperature storage. Retention of heat over periods longer than this is challenging, even with significant levels of insulation. Seasonal storage of heat in an encapsulated store appeared impractical in all cases modelled due to the volume of material required.",
keywords = "Building simulation, Demand flexibility, Sizing methodology, Thermal demand, Thermal storage",
author = "John Allison and Keith Bell and Joe Clarke and Andrew Cowie and Ahmed Elsayed and Graeme Flett and Gbemi Oluleye and Adam Hawkes and Graeme Hawker and Nick Kelly and {de Castro}, {Maria Manuela Marinho} and Tim Sharpe and Andy Shea and Paul Strachan and Paul Tuohy",
year = "2018",
month = "5",
day = "25",
doi = "10.1016/j.applthermaleng.2018.02.104",
language = "English",
volume = "136",
pages = "602--616",
journal = "Applied Thermal Engineering",
issn = "1359-4311",
publisher = "Elsevier",

}

TY - JOUR

T1 - Assessing domestic heat storage requirements for energy flexibility over varying timescales

AU - Allison, John

AU - Bell, Keith

AU - Clarke, Joe

AU - Cowie, Andrew

AU - Elsayed, Ahmed

AU - Flett, Graeme

AU - Oluleye, Gbemi

AU - Hawkes, Adam

AU - Hawker, Graeme

AU - Kelly, Nick

AU - de Castro, Maria Manuela Marinho

AU - Sharpe, Tim

AU - Shea, Andy

AU - Strachan, Paul

AU - Tuohy, Paul

PY - 2018/5/25

Y1 - 2018/5/25

N2 - This paper explores the feasibility of storing heat in an encapsulated store to support thermal load shifting over three timescales: diurnal, weekly and seasonal. A building simulation tool was used to calculate the space heating and hot water demands for four common UK housing types and a range of operating conditions. A custom sizing methodology calculated the capacities of storage required to fully meet the heat demands over the three timescales. Corresponding storage volumes were calculated for a range of heat storage materials deemed suitable for storing heat within a dwelling, either in a tank or as an integral part of the building fabric: hot water, concrete, high-temperature magnetite blocks, and a phase change material. The results indicate that with low temperature heat storage, domestic load shifting is feasible over a few days. Beyond this timescale, the very large storage volumes required make integration in dwellings problematic. Supporting load shifting over 1–2 weeks is feasible with high temperature storage. Retention of heat over periods longer than this is challenging, even with significant levels of insulation. Seasonal storage of heat in an encapsulated store appeared impractical in all cases modelled due to the volume of material required.

AB - This paper explores the feasibility of storing heat in an encapsulated store to support thermal load shifting over three timescales: diurnal, weekly and seasonal. A building simulation tool was used to calculate the space heating and hot water demands for four common UK housing types and a range of operating conditions. A custom sizing methodology calculated the capacities of storage required to fully meet the heat demands over the three timescales. Corresponding storage volumes were calculated for a range of heat storage materials deemed suitable for storing heat within a dwelling, either in a tank or as an integral part of the building fabric: hot water, concrete, high-temperature magnetite blocks, and a phase change material. The results indicate that with low temperature heat storage, domestic load shifting is feasible over a few days. Beyond this timescale, the very large storage volumes required make integration in dwellings problematic. Supporting load shifting over 1–2 weeks is feasible with high temperature storage. Retention of heat over periods longer than this is challenging, even with significant levels of insulation. Seasonal storage of heat in an encapsulated store appeared impractical in all cases modelled due to the volume of material required.

KW - Building simulation

KW - Demand flexibility

KW - Sizing methodology

KW - Thermal demand

KW - Thermal storage

UR - http://www.scopus.com/inward/record.url?scp=85044159909&partnerID=8YFLogxK

U2 - 10.1016/j.applthermaleng.2018.02.104

DO - 10.1016/j.applthermaleng.2018.02.104

M3 - Article

VL - 136

SP - 602

EP - 616

JO - Applied Thermal Engineering

JF - Applied Thermal Engineering

SN - 1359-4311

ER -