It is probable that a construction project anywhere in the world will encounter some form of delay as a consequence of change. The impact of the delay on a project will vary, but it is likely to have a negative financial outcome. Compensation can be requested by an affected party in the form of a claim; however, issues of liability and quantum can be difficult given the ever increasing complexity of construction work involving numerous differing successive parallel tasks with varying levels of interrelated resources. Experts are often employed to analyse delays based on project records and report their findings to a tribunal. This paper identifies the difficulties associated with the retrieval and representation of information for delay claims and recognises technological opportunities to deal with these challenges. The potential to exploit aspects of BIM to support these possibilities are discussed, concluding that it can assist through the ease of access to coordinated contemporaneous project information and the use of visualisation through multiple dimensions. In order to support this initiative a detailed review of the literature is undertaken which forms part of an Engineering Doctorate.
Original languageEnglish
Pages (from-to)45-52
JournalInternational Journal of 3-D Information Modeling (IJ3DIM)
Volume2
Issue number1
DOIs
Publication statusPublished - 2013

Fingerprint

liability
visualization
expert
engineering
resources
literature

Cite this

An investigation into whether building information modeling (BIM) can assist with construction delay claims. / Gibbs, D. J. ; Emmitt, S.; Ruikar, K.; Lord, W.

In: International Journal of 3-D Information Modeling (IJ3DIM), Vol. 2, No. 1, 2013, p. 45-52.

Research output: Contribution to journalArticle

@article{74b94b1150d24cb29b5892c0c4263824,
title = "An investigation into whether building information modeling (BIM) can assist with construction delay claims",
abstract = "It is probable that a construction project anywhere in the world will encounter some form of delay as a consequence of change. The impact of the delay on a project will vary, but it is likely to have a negative financial outcome. Compensation can be requested by an affected party in the form of a claim; however, issues of liability and quantum can be difficult given the ever increasing complexity of construction work involving numerous differing successive parallel tasks with varying levels of interrelated resources. Experts are often employed to analyse delays based on project records and report their findings to a tribunal. This paper identifies the difficulties associated with the retrieval and representation of information for delay claims and recognises technological opportunities to deal with these challenges. The potential to exploit aspects of BIM to support these possibilities are discussed, concluding that it can assist through the ease of access to coordinated contemporaneous project information and the use of visualisation through multiple dimensions. In order to support this initiative a detailed review of the literature is undertaken which forms part of an Engineering Doctorate.",
author = "Gibbs, {D. J.} and S. Emmitt and K. Ruikar and W. Lord",
year = "2013",
doi = "10.4018/ij3dim.2013010105",
language = "English",
volume = "2",
pages = "45--52",
journal = "International Journal of 3-D Information Modeling (IJ3DIM)",
issn = "2156-1710",
number = "1",

}

TY - JOUR

T1 - An investigation into whether building information modeling (BIM) can assist with construction delay claims

AU - Gibbs, D. J.

AU - Emmitt, S.

AU - Ruikar, K.

AU - Lord, W.

PY - 2013

Y1 - 2013

N2 - It is probable that a construction project anywhere in the world will encounter some form of delay as a consequence of change. The impact of the delay on a project will vary, but it is likely to have a negative financial outcome. Compensation can be requested by an affected party in the form of a claim; however, issues of liability and quantum can be difficult given the ever increasing complexity of construction work involving numerous differing successive parallel tasks with varying levels of interrelated resources. Experts are often employed to analyse delays based on project records and report their findings to a tribunal. This paper identifies the difficulties associated with the retrieval and representation of information for delay claims and recognises technological opportunities to deal with these challenges. The potential to exploit aspects of BIM to support these possibilities are discussed, concluding that it can assist through the ease of access to coordinated contemporaneous project information and the use of visualisation through multiple dimensions. In order to support this initiative a detailed review of the literature is undertaken which forms part of an Engineering Doctorate.

AB - It is probable that a construction project anywhere in the world will encounter some form of delay as a consequence of change. The impact of the delay on a project will vary, but it is likely to have a negative financial outcome. Compensation can be requested by an affected party in the form of a claim; however, issues of liability and quantum can be difficult given the ever increasing complexity of construction work involving numerous differing successive parallel tasks with varying levels of interrelated resources. Experts are often employed to analyse delays based on project records and report their findings to a tribunal. This paper identifies the difficulties associated with the retrieval and representation of information for delay claims and recognises technological opportunities to deal with these challenges. The potential to exploit aspects of BIM to support these possibilities are discussed, concluding that it can assist through the ease of access to coordinated contemporaneous project information and the use of visualisation through multiple dimensions. In order to support this initiative a detailed review of the literature is undertaken which forms part of an Engineering Doctorate.

UR - http://dx.doi.org/10.4018/ij3dim.2013010105

U2 - 10.4018/ij3dim.2013010105

DO - 10.4018/ij3dim.2013010105

M3 - Article

VL - 2

SP - 45

EP - 52

JO - International Journal of 3-D Information Modeling (IJ3DIM)

JF - International Journal of 3-D Information Modeling (IJ3DIM)

SN - 2156-1710

IS - 1

ER -