Projects per year
Description
The dataset has been prepared to summarise the life cycle inventory that has been developed to describe the environmental impacts of the building used as a case study for the study. The life cycle inventory has been prepared by completing a material take-off from the as-built drawings and material specifications for the building. The material take-off has been used to develop quantities and material specifications that can be used to represent the building without knowing the exact details of the building.
Date made available | 7 Mar 2023 |
---|---|
Publisher | University of Bath |
Projects
- 1 Finished
-
ABC: Industrial Strategy Challenge Fund - Active Building Centre
Coley, D., Allen, S. & Walker, I.
Engineering and Physical Sciences Research Council
3/09/18 → 30/09/22
Project: Research council